Hyundai Heavy Industries Power Systems provides high-quality HRSG (Heat Recovery Steam Generator) of both horizontal and vertical types based on abundant experience.

With our comprehensive engineering capabilities, we are proud to be offering the most cost-competitive and technically-advanced HRSG to our customers worldwide.

We continuously enhance our abilities and capacities to accommodate the sophisticated requirements of our clients, while enjoying the reputation of a company with high-quality, high-performance products.

Track records

HPS is providing total engineering services from basic engineering to field services as the reliable supplier based on advanced technical knowledge and decades of experience in thermal power plants and co-generation plants.
악수하는 두 사람과 건물사진이 중첩된 사진

Track records

  • Since 1987, based on abundant experiences in CHP (Combined Heat & Power) and CCP (Combined Cycle Power) industries, HPS offers trusted technologies in the process—from design, production, and installation for HRSGs with a wide range of capacity, including HSRG for the latest H-Class gas turbines.HPS has successfully produced and supplied 96 units of HRSG for 37 projects in total.
산 정상에 오른 깃발 든 사람 사진
  • HRSG for Industrial Plant
    • · First HRSG Delivery (1987)
  • HRSG for
    Power Plant
    • · Boiler & HRSG Manufacturing Shop Move/Operation (2004, YHHI in China)
    • · YHHI First HRSG Manufacturing & Delivery (2009)
    • · Listed as GE’s Supplier for 9F GT (2010)

HRSG Product Feature

  • HRSG Type : Horizontal, Vertical
  • Capacity : 25MW GTG ~ H-Class
  • Pressure : Single, Dual or Triple(with RH, with Integral Deaerator)
  • Temperature : As per STG requirements
  • Module Design Type : Module Box, Loose Harp, Tube Block
  • GTG / Duct Burner Fuel : Natural Gas, Process Gas, Diesel Oil,
    LSWR (Low Sulfur Wax Residual Oil) or Crude Oil
  • Applying 3D design for every step
  • CFD (Computational fluid dynamics) stress Analysis with Lifetime Analysis
  • Utilizing easy installation type considering site conditions
HYUNDAI HEAVY INDUSTRIES POWER SYSTEMS

HPS is maintaining highly-qualified workforces and state-of-the art project management know-how accumulated through numerous, self-performed EPC turnkey projects.

이미지입니다.

Tihama Co-generation in KSA

•  End User  :  Thiama Power Company, KSA

•  Site           :  UthmaniyahShedgumRas TanuraJu’aymah in Saudi Arabia

•  Capacity   :  HRSG 2,000 t/h

                      (GTG 156 MW x 2 x 2 76 MW 2 x 1 / 156 MW x 2 x 1)

•  Fuel          :  Natural Gas

•  Operation :  2006

이미지입니다.

Tihama Stage II Co-generation in KSA

•  End User  :  Tihama Power Company, KSA

•  Site           :  UthmaniyahShedgumJu’aymah in Saudi Arabia

•  Capacity   :  HRSG 358 t/h x 3

                       (GTG 186 MW x 1, Each Site)

•  Fuel          :  Natural Gas

•  Operation :  2015

이미지입니다.

Riyadh PP11 IPP in KSA

•  End User   :  Dhuruma Electricity Company, KSA

•  Site            :  Dhuruma, Saudi Arabia

•  Capacity    :  HRSG 319 t/h x 7

                       (GTG 157 MW x 7 / STG 352 MW x 2)

•  Fuel           :  Natural Gas / Arabian Super Light

•  Operation  :  2013

이미지입니다.

Sabiya CCGT in Kuwait

•  End User   :  Ministry of Electricity & Water, Kuwait

•  Site            :  Sabiya, Kuwait

•  Capacity    :  HRSG 270 t/h x 6

                        (GTG 225 MW x / STG 249 MW x 3)

•  Fuel           :  Natural Gas / Gas Oil

•  Operation  :  2012

이미지입니다.

Al Dur IWPP in Bahrain

•  End User    :  Al Dur Power and Water Company, Bahrain

•  Site             :  Al Dur, Bahrain

•  Capacity     :  HRSG 444 t/h x 4

                         (GTG 201 MW x / STG 272 MW x 2 / RO 48 MIGD)

•  Fuel            :  Natural Gas / Diesel Oil

•  Operation   :  2011

위쪽 화살표

Top